17 de abril de 2026
ACAGEO | Specialists in geotechnical solutions
ACAGEO ensured the perimeter retention system using secant piles and temporary anchors, creating the necessary conditions for safe excavation.
In addition, the structural reinforcement of the existing building was secured through the execution of foundation micropiles.