16 de setembro de 2025
Geotechnical intervention at Casa da Música Station supports the expansion of the Pink Line of the Porto Metro

ACAGEO executed a pile wall with temporary anchors to enable basement excavation in the Casa da Música area, as part of the expansion of the Pink Line of the Porto Metro.
This precision geotechnical intervention was carried out in a challenging urban context, ensuring stability and safety during the execution of the works.
The works reflect ACAGEO’s commitment to applying innovative and rigorous solutions in the construction of complex infrastructure with a significant impact on urban mobility.
