16 de setembro de 2025

Structural reinforcement at São Bento Station advances for the expansion of the Pink Line of the Porto Metro

In the heart of São Bento Station, ACAGEO is installing micropiles with a diameter of 300 mm, essential for structural consolidation as part of the expansion of the Pink Line of the Porto Metro.

This high-precision work ensures the safety and robustness required for the modernisation of the network, strengthening the infrastructure in a central area with heavy urban traffic.

The intervention demonstrates ACAGEO’s technical capability to tackle complex challenges in sensitive urban contexts.